ISTANBUL NEW AIRPORT STEELWORK


Below are the works carried out at the Istanbul New Airport:

  • Hammerhead bridges (50 tons)
  • Riser Steels (1150 tons)
  • Service Floor Steels (2900 tons)
  • +2,70 Steels (700 tons)
  • Buggy Ramps (780 tons)
  • PB4- Lounge (60 tons)
  • Office of the Chair (15 tons)
  • Terminal Building Lease Area Steels (1380 tons)
  • Pier Buildings Lease Area Steels (500 tons) 
  • Passenger Transfer Bridges Stairs (380 tons)
  • DHMİ Radar Towers "6 Separate" (380 tons)
  • Terminal Building Elevator Shafts (320 tons)
  • Terminal Building Additional Electric Rooms (100 tons)
  • General Airport Hadle Works (4900 tons)